G
GeoTender
Bid Intelligence · Meridian AI Systems
Verified Intel · 24 Feb 2026
Lagos, Nigeria
Demo
Breaking Intelligence
NCDMB · SAIPEC 2026 · Feb 10–12
Intermediary certification ban — effective now
Director Halilu: "Critical criterion in technical tenders." Shell companies eliminated at ITT. Geoscape's 16 genuine years = unbeatable moat.
✓ ncdmb.gov.ng — Verified
NCDMB · SAIPEC 2026 Financing
$50M Women in Energy Fund — Geoscape qualifies
GM Tuatongha confirmed $50M WIE Fund + $500M NCI Fund at SAIPEC 2026. Woman-owned indigenous contractor = textbook qualifying candidate. Solves financial capacity on large bids.
✓ ncdmb.gov.ng — Verified
Renaissance Africa · NIPEX · Active Now
7+ live tenders — Q1 2026 contracts open
Formerly Shell Nigeria. 18 OMLs. Freight, remediation, seismic, drilling — all Q1 2026. Require "Nigerian companies with requisite experience." Geoscape has a decade of Shell delivery.
✓ nipex-ng.com — Verified
NCDMB · Vanguard · Dec 2024
Local content: 56% achieved → 70% by 2027
Nigeria rose from 5% in 2010 to 56% in 2024. Presidential directive: 70% by 2027. Every IOC contract now scrutinised. Geoscape's indigenous status is a commercial weapon.
✓ NCDMB / Vanguard — Verified
TotalEnergies · NIES 2026 · Feb 4
Ubeta executing — IMA FID expected 2026
Ubeta targeting first gas 2027 at 70,000 boepd. IMA FID in 2026 opens a second contractor wave. Performing on Ubeta now = first call on IMA.
✓ NIES 2026 — Verified
Geoscape Limited
Indigenous Contractor · Ikoyi, Lagos · Est. 2009 · Woman-Owned
16
Years
47+
Projects
9
IOC Clients
ShellChevron TotalEnergiesNLNG ExxonMobilSeplat DangoteFMN
Active RFQ — Priority One
TotalEnergies EP Nigeria — Technical Manpower & Engineering Support, Ubeta Gas Development OML 58
NIPEX Active Tender · Received Feb 12, 2026 · Deadline: March 10, 2026 · 14 Days Remaining
● Geoscape currently delivering Technical Manpower on Ubeta — scope extension of a live engagement
NIPEX Live
TotalEnergies EP Nigeria Ltd.
Provision of Technical Manpower & Engineering Support — Ubeta Gas Development, OML 58 Execution Phase
TotalEnergies EP Nigeria Limited (TEPNG), Operator of OML 58 in JV with NNPC Ltd, requires technical manpower and engineering support during Ubeta's execution phase. Targeting first gas 2027 at ~70,000 boepd, Ubeta is designed as one of the world's first near net-zero gas developments with a 5MW solar plant at OML 58. Over 90% of work hours committed to Nigerian contractors. Scope: Obite Treatment Centre, Rivers State through offshore infrastructure.
Contract Type
Lump Sum + Reimbursable
Duration
18 Months + 12M Option
Est. Value
$800K – $2.1M
Mobilisation
April 2026
Deadline
March 10 · 4PM
Days Remaining
14 Days
Scope of Work Ubeta Execution 2026
⚙️
Process, Piping, Mechanical and Instrumentation engineers — installation and commissioning of 6-well cluster and 11km buried pipeline at Obite Treatment Centre, OML 58
🔧
Turnaround and maintenance specialists — rotating equipment, heat exchangers, compression systems
72-hour call-out mandatory from Lagos or Port Harcourt
🌿
HSE and environmental compliance engineers — near net-zero commitments, 5MW solar plant oversight and PEMP monitoring
FATAL FLAW — HSE score below 60% = eliminated before commercial evaluation
🇳🇬
Minimum 90% Nigerian personnel — full NCDMB Local Content Plan required at tender stage
FATAL FLAW — PIA 2021 + NOGICD Act 2010 compliance non-negotiable
Verified Market Intelligence — February 2026 Every Item Source-Confirmed
🏛️
NCDMB Director Halilu · SAIPEC 2026 · Eko Convention Centre, Lagos · Feb 10–12, 2026
Intermediary Certification Ban — "Critical Criterion in Technical Tenders"
New NCEC Guidance Notes (Dec 2025) prohibit agents and middlemen from NCEC applications. NCDMB now physically verifies all claims — offices, equipment, personnel. Halilu stated explicitly: "This will be a critical criterion in technical tenders." Result: competitors on borrowed certifications are eliminated at ITT stage. 16 years of genuine Geoscape operations pass every verification test they cannot.
✓ Verified — ncdmb.gov.ng · February 2026
💰
NCDMB GM Tuatongha · SAIPEC 2026 Financing Panel · February 2026
$50M Women in Energy Fund — Geoscape Is the Textbook Qualifying Candidate
NCDMB confirmed the $50M Women in Energy Fund alongside $500M NCI Fund and $100M Equity Fund at SAIPEC 2026. As a woman-owned indigenous contractor with 16 years of IOC delivery, Geoscape is precisely the profile this fund was designed for. An application letter strengthens financial capacity on this bid and every future large bid — without exposing audited accounts.
✓ Verified — ncdmb.gov.ng · SAIPEC 2026 · February 2026
🔥
Renaissance Africa Energy · NIPEX Portal · Tenders CW950997, CW964102 et al. · Active Now
Renaissance (Formerly Shell Nigeria) — 7+ Live NIPEX Tenders, Q1 2026 Contracts Starting
Renaissance completed Shell's $1.3B onshore acquisition in March 2025 and now operates the NNPC/Renaissance/TotalEnergies/AENR JV across 18 former Shell OMLs. Running 7+ NIPEX tenders — freight forwarding, oil spill remediation (60-month), seismic, drilling — all Q1 2026. Their tender documents explicitly require "Nigerian companies with requisite experience." No contractor has a deeper Shell Nigeria delivery record than Geoscape. This is a first-mover opportunity before competitors recognise the opening.
✓ Verified — nipex-ng.com · publicprocurement.ng · RAEC tender documents confirmed
Engine: ● Live
Sources: NCDMB · NIPEX · NIES 2026 · SAIPEC 2026
Verified: February 24, 2026
GeoTender AI · Meridian AI Systems · meridianaisystems.com
AI Bid Analysis
Intelligence Loaded
16 years of Geoscape history combined with verified live market data from this week. Press Run AI Analysis for your complete bid strategy.
Verified Sources Loaded
NCDMB · SAIPEC 2026 directives (Feb 10–12)
TotalEnergies Ubeta status · NIES 2026 (Feb 4)
Renaissance NIPEX tenders — 7+ confirmed live
$50M Women in Energy Fund (SAIPEC 2026)
NCDMB 56% → 70% roadmap (Dec 2024)
New NCEC Guidance Notes (Dec 2025)